 As I am nearing the end of my portfolio, I wanted to give an update on my production schedule. Apart from the ones that I include in my blogs, there have been changes in my schedule. 


My original production schedule looked like this: 


  • unchecked

    January 18th-20th: Further blogs on idea

  • unchecked

    January 27th: blogs due

  • uncheckedFebruary 1st

    chose filming location

  • unchecked

    February 3rd: Blogs due, reveal title of film intro

  • unchecked

    February 7th: ask Frances (again) to be in video and write the plot/dialogue

  • unchecked

    February 10th: figure out costumes, camera, and editing software (AND BLOGS DUE)

  • unchecked

    February 14th: Get filming down for first 45 - 60 seconds of film intro

  • unchecked

    February 17th: Blogs due

  • unchecked

    February 24th: Blogs due

  • unchecked

    February 28th: Get filming done for the second half

  • unchecked

    March 1st: Save the day for any refilming needed

  • unchecked

    March 3rd: Begin editing process

  • unchecked

    March 7th: See if you have time to stop by You Media. 

  • unchecked

    Marth 10th- 11th: complete CCR

  • unchecked

    March 17th - 21st: Edit CCR and finalize the film intro 

And my updated schedule looks like this: 


  • checked

    January 18th-20th: Further blogs on idea

  • checked

    January 27th: blogs due

  • checked

    February 1st: chose filming location

  • checked

    February 3rd: Blogs due, reveal title of film intro

  • checked

    February 7th: ask Frances (again) to be in video and write the plot/dialogue [half done]

  • checked

    February 10th: figure out costumes, camera, and editing software (AND BLOGS DUE)

  • More like the 11th… (DONE)

  • checked

    February 14th: Get filming down for first 45 - 60 seconds of film intro

  • Will probably be moved to the 16th.. (DONE)

  • Things occurring on that day may interfere with filming

  • checked

    February 17th: Blogs due

  • checked

    February 24th: Blogs due

  • checked

    February 28th: Get filming done for the second half

  • checked

    March 1st: (need some parts done for the second half so will be done the 1st.) ~ NOT DONE

  • checked

    March 3rd: ALL FILMING DONE/blogs due

  • unchecked

    March 7th: Begin editing process

  • unchecked

    March 7th: See if you have time to stop by You Media. 

  • unchecked

    March 10th- complete CCR Pt.1/hard deadline on blogs

  • unchecked

    March 14th: complete CCR Pt.2

  • unchecked

    March 17th - 21st: Edit CCR and finalize the film intro 

  • unchecked

    Monday after spring break [March 31st]: PORTFOLIO DUE



This was a perfect example of how God has his own plan, seriously. We can plan out all we want, but the amount of changes, setbacks, new things that happened in a span of a little over a month is crazy. As we get close to the due date, I realized how much work has to be done, in a short span of time (two months really is not a long time). There have been setbacks, but for the most part the setbacks have been by a couple days, due to a lot of school work, or work work, but I have been able to push back. As of today, refilming is done, and tomorrow is an editing day. I hope to complete editing the film intro by the end of this week (or before I work this weekend.) 



To keep up with my schedule, I also have my blogs planned out in a way that I do a certain amount of work needed for each week, and ensure I am hitting those deadlines –listed on the schedule. (Google Doc tabs have been a lifesaver, especially since Blogger does not work in school). [picture below]








Also, to keep myself organized I have created labels for my blogs and taught with the class on how to do so, and created a google document so then my classmates can use it later (and maybe future ones as well).And then CCRs will start up next week! 

Next up: Filming Day Two!



No comments:

Post a Comment

#40 CCR Pt.2 !!

 Here is the link to the Canva presentation:  https://www.canva.com/design/DAGjoWwIWP0/6nZDE6Ch8uFFcYFw0Y5A6Q/edit?utm_content=DAGjoWwIWP0...