Sunday, January 19, 2025

#10 My Production Schedule

 Just a quick one for today...But this is the blog of the season. (I am kidding). 

Posted below is my drafted production schedule. (any updates will be posted soon after). 

Initially, I already had a mental schedule and planned to do filming on the day of my anniversary; although, I figured to take time to enjoy myself, so on Valentine's Day (notorious for love and being distracted by flowers and chocolate, but I will LOCK IN.) 


Overall, my schedule will consist of at least 2 and 1/2 weeks of planning to get secure, and then filming for 2 separate days, with a week in between. Although just in case (because I know myself), I have a day planned specifically for extra filming or refilming. After that, it is straight to the editing process and the CCR. (I want to do it either as a popular news interview or film tour). 

Alright that's all for now... Next, copyrighting!

No comments:

Post a Comment

#40 CCR Pt.2 !!

 Here is the link to the Canva presentation:  https://www.canva.com/design/DAGjoWwIWP0/6nZDE6Ch8uFFcYFw0Y5A6Q/edit?utm_content=DAGjoWwIWP0...